# Bathroom remodel rough-in and fixture set

> Before and after photos of a bathroom remodel rough-in: shower moved, new drain and supply lines, 2 plumbers, 2 days on site.

## The job

The owners were turning a bathroom with a tub into a walk-in shower with a double vanity. The shower was moving to the opposite wall, so the drain, vent, and supply lines all had to follow.

## What we did

Two plumbers took out the old fixtures, cut a new path in the floor for the shower drain and trap, and rerouted the drain and vent lines to the new layout. Supply lines went in for the shower and both basins, with a pressure-balancing valve set in the wall at the agreed height. The rough-in passed inspection before the walls were closed. After tiling, the plumbers came back to fit the toilet, taps, and shower trim.

## The result

The new shower drains without pooling, both basins run at full flow at the same time, and the valve keeps the temperature steady when the toilet is flushed.