Bathroom before: open stud wall with new drain and supply pipes roughed in
Before
The same wall after: tiled shower with the valve and shower head fitted
After

Shower wall, after tiling and the valve trim went on

The job

The owners were turning a bathroom with a tub into a walk-in shower with a double vanity. The shower was moving to the opposite wall, so the drain, vent, and supply lines all had to follow.

What we did

Two plumbers took out the old fixtures, cut a new path in the floor for the shower drain and trap, and rerouted the drain and vent lines to the new layout. Supply lines went in for the shower and both basins, with a pressure-balancing valve set in the wall at the agreed height. The rough-in passed inspection before the walls were closed. After tiling, the plumbers came back to fit the toilet, taps, and shower trim.

The result

The new shower drains without pooling, both basins run at full flow at the same time, and the valve keeps the temperature steady when the toilet is flushed.

What the customer said
“They worked around our tiler's dates and came back to fit everything the day the grout was dry.”

Sofia N. · Westfield Heights

Closed · Aug 26, 2026

  • Old tub, toilet, and vanity taken out
  • New shower drain and trap set in the floor
  • Drain and vent lines rerouted to the new layout
  • Supply lines run for the shower and double vanity
  • Pressure-balancing valve set in the wall
  • Rough-in inspected and signed off
  • Toilet, taps, and shower trim fitted after tiling
  • Technicians: 2
  • Time on site: 2 days
  • Area: Westfield Heights

Job total$2,900

Plumbing only, tiling by the owner's contractor

Get a price for a job like thisSee this service

Have a job like these?

Tell us what is leaking, blocked, or not heating. You get a price before any work starts.

A plumber working on the drain pipes under a vanity
Buy NowTheme Details