At 2 a.m. on the first frosty night of the season, a copper supply pipe split in the crawl space under the kitchen. Water was coming up through the floorboards when the owner called.

What we did

While the plumber was on the way, the dispatcher talked the owner through finding and closing the main shut-off. On site, the plumber cut out the split section, soldered in a new length of copper, and pressure-tested the joint. The exposed pipes in the crawl space were wrapped in insulation so the same run would not freeze again.

The result

Water was back on before 5 a.m. The owner got written drying advice (fans running, cabinet doors open, the wet rug lifted) and dated photos of the damage and the repair for the insurance claim.

What the customer said
“He talked me through finding the shut-off on the phone, then was at the door forty minutes later.”

Nadia K. · North Harbor

Closed · Oct 19, 2026

  • Owner talked through closing the main shut-off
  • On site within the hour
  • Split section of copper cut out
  • New section soldered in and tested
  • Exposed pipes in the crawl space insulated
  • Water back on, every fixture checked
  • Drying advice and photos for the insurer
  • Technicians: 1
  • Time on site: 2 h 15
  • Area: North Harbor

Job total$480

Night call-out rate, parts included

Get a price for a job like thisSee this service

Have a job like these?

Tell us what is leaking, blocked, or not heating. You get a price before any work starts.

A plumber working on the drain pipes under a vanity
Buy NowTheme Details